EN
6.2
Terminal plan
Rondomat Duo DVGW 6 and 10 terminal plan
B
Power
supply
Valve block
unit
A
Electrolysis
Elektrolyse
DVGW
DVGW
Elektrolysezelle
Electrolysis cell
● Remove mains plug.
● Fasten the DVGW electrolysis unit to the back of the Soft Control console using the supplied screws and fastenings.
● Connect wire A to the valve block and to the electrolysis cell using plugs.
● Connect wire B to the terminals on the Soft Control controller.
● The mains plug of the Soft Control controller can be removed and the cable can be connected to terminals L, N of the DVGW electrolysis unit.
38