Herunterladen Inhalt Inhalt Diese Seite drucken

Back Panel; Mounting The Switch - FS S5500-48T6SP-R Schnellstartanleitung

Stapelbarer 48-port gigabit l3 poe+ managed switch
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Back Panel

Site Environment
Make sure that the site environment is well-ventilated, the heat of electrical devices is
well-discharged and sufficient air circulation is provided for device cooling.
Avoid to damage devices by following the electrostatic discharge prevention procedure.
Ensure that there is adequate air flow around the switch. Make sure the machine box is sealed
because the opened machine box will reverse the cool air flow.

Mounting the Switch

Desk Mounting
1. Attach four rubber pads to the bottom.
2. Place the chassis on a desk.
Grounding Point
INPUT
OUTPUT
PWR2
INPUT
OUTPUT
100-240Vac 50/60Hz 7-3.5A
100-240Vac 50/60Hz 7-3.5A
Dual Power
PWR1
2
1
3

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis