Herunterladen Inhalt Inhalt Diese Seite drucken

Continuity Test - HT Italia FLASHMETERPRO Bedienungsanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 60
5.4.

CONTINUITY TEST

Before attempting any resistance measurement, cut off power supply from
the circuit to be measured and make sure that all capacitors are discharged,
if present.
1. Switch on the instrument by pressing the
automatically selected and the indication
2. Press the V/Ω/ /A
3. Insert the red cable into input terminal VΩ
COM.
4. Position the test leads in the circuit to be measured (see Fig. 6). The continuity buzzer
activates for R<50
5. To use the AutoHOLD function, see § 4.3.2
Fig. 6: Use of the instrument for Continuity test
key until the symbol
CAUTION
/
key. The measuring mode Ω is
OL.
appears on the display.
"
"
appears on the display.
" "
and the black cable into input terminal
EN - 11
FLASHMETERPRO

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis