Herunterladen Inhalt Inhalt Diese Seite drucken

Grounding; Test Run Initial Start-Up; Notes On The First 20 Operating Hours; Operating Instructions - Zipper Maschinen ZI-STE1800IV Betriebsanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

18.1.1 Grounding

Before putting the machine into operation, install a grounding system!
However, if there is any uncertainty, have a competent electrician set up a grounding
system.
Exact grounding instructions for portable machiness depend on the jurisdiction of the country in
which the machine is commissioned. Please observe them exactly.

18.1.2 Test Run Initial Start-up

Let the machine run idle for about 3 minutes.
Pay attention to abnormal noises.
Pay attention to the exhaust fumes (too black, too white)?

18.1.3 Notes on the first 20 operating hours

In order to optimize the life expectancy of your machine, the following points should be
observed:
Do not operate the engine for the first 20 operating hours at maximum load (this also
applies to used engines after extensive maintenance). This means lower speed and lower
maximum working load than during normal operation.
Change the engine oil after the first 20 hours of operation.

Operating Instructions

18.2.1 Integration into stationary system (mains)

This machine is designed exclusively for the operation of electrical devices whose maximum
power lies within the power specifications of the machine. A higher starting current from
inductive loads must be taken into account.
The machine is designed for the operation of conventional ohmic and inductive loads such as
light chains, electric hand tools (drilling machines, electric chain saws, compressors).
When connecting to stationary systems such as heating, house supply, air
conditioning or for the power supply of mobile homes, an electrician and the heating
manufacturer must be consulted regarding connection and grounding.

18.2.2 Devices are connected to the AC terminals

Check that the run light (green) lights up after starting the machine.
Before connecting a device on the AC socket you must control the perfect condition of the
device.
When you recognize that a connected device acts unusual you must stop the machine
and disconnect the device. Control whether the device is damaged or if the machine was
overloaded by the device.
Please consult the rating specifications on the connected electrical devices, these can
usually be found next to the serial or manufacturing number.
Please consider: Some devices, for instance cooling devices need up to 5 times more
starting current than current during the operation.
ZIPPER MASCHINEN GmbH
ZI-STE1800IV
Before putting the machine into operation:
1. Make sure that the machine is switched off before
2. Connect the ground clamp to the ground terminal (1) of
3. Push the attached grounding rod into the ground.
NOTICE:
a tripping hazard.
After stopping the machine:
4. Ensure that the machine has been switched off and has
www.Zipper-Maschinen.at
installing the grounding.
the machine.
Ensure that the grounding wire does not represent
cooled down before removing the ground clamp.
OPERATION
30

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

10540192

Inhaltsverzeichnis