Herunterladen Inhalt Inhalt Diese Seite drucken

WIKA Cryo Gauge 712.15.100 Betriebsanleitung Seite 21

Vorschau ausblenden Andere Handbücher für Cryo Gauge 712.15.100:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

4. Commissioning, operation
Dismounting cable socket
The cable socket is prefitted and must be dismantled as described below.
Screw
Cable cover cap
Cable cover
Socket insert
Cable socket baseplate
Sealings
Fully loosen the screws on the cable cover cap with a slotted screwdriver (0.6 x 3.5 mm)
and remove them.
Pull the cable cover, along with the socket insert, out from the cable socket baseplate
(joined permanently with the instrument).
Take the cable cover cap and push the socket insert out, downwards, completely through
the cable cap.
Pin assignment cable socket
4 ... 20 mA, 2-wire
Do not use this
terminal
U
+/I+
B
Supply
voltage
+0V/GND
Evaluation
Terminals 3 and 4: For internal use only
(display)
Terminals 5 and 6: Reset zero point
Differential pressure gauge models 712.15.100, 732.15.100, optional for hazardous areas
Only use cable with a diameter of
7 ... 13 mm
EN
21

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Cryo gauge 732.15.100

Inhaltsverzeichnis