Herunterladen Inhalt Inhalt Diese Seite drucken

Yard Force Classic 500B Installationsanleitung Seite 7

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 13
GB
Insert the mains plug into a properly installed socket. Once the blue LED confirms all is OK, test
the Robotic Mower's function. Check the LED regularly to ensure fixing the boundary wire has not
affected the connection and signal shows S1 on the charging satation. Then place the Robotic
Mower in the working area, a few metres beside the docking station. Set the main power switch
to "ON". and then check the S1 signal on the panel is light on, press
panel.
Press the buttons
and
, a few seconds later, the Robotic Mower should automatically
return to the docking station by locating and following the boundary wire in anti-clockwise
direction. If Robotic Mower fails to dock correctly, move the docking station to a more suitable
position.
1
Once the device has docked, the symbol
indicators on the docking station will flash alternately. This indicates that the battery is charging
correctly.
S1
After initial installation, the Robotic Mower will remain in the docking station until the battery is
fully charged.
Successful docking and charging indicates that you have found a suitable position for the docking
station. You should now drive fixing pegs into ground fully.
Take care not to damage or kink the surplus wire stored under the docking station.
4 times to unlock the
2
on the panel will start flashing, and the S1&S2
S2
8
Signal selection
Note: the default signal is S1, no need to change the signal when there isn't a influence signal
form the neighbors.
S1
S2
S1
If your neighbour is using the same mower, you will need to keep a distance of 0.5m between
you and your neighbour's boundary wires to prevent the two devices interfering with each other.
Ensure to position your docking station at least 10m away from your neighbour's boundary wires
and that both products are using different signals. Please refer to section "Signal setting" in order
to select signal S1 or S2 for your installation.
1.
Press the "signal" button on the charging station, the indicator will be switched to S2.
2.
Press the "S2" button on the control panel. the indicator will be switched to S2
>10 m
>0.5 m
S1
S2
S2
>10 m
9
GB

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Classic 600b

Inhaltsverzeichnis