Herunterladen Inhalt Inhalt Diese Seite drucken

Installation; Installation Conditions; Mounting Process - OSRAM e:cue SYMPL Installationsanleitung

Vorschau ausblenden Andere Handbücher für e:cue SYMPL:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

4

Installation

The installation of the SYMPL e:bus Node consists of mounting the device,
connections to e:bus devices, to e:net, and to power supply.
The sequence of cabling is not defined. Supply the SYMPL e:bus Node
with power after all cabling is completed; it starts booting.
Connect cables and data only when the device is powered
!
down.
Each cable should not exceed a length of 30 m.
!
4.1

Installation conditions

Installation position:
Horizontal spacing:
Minimum vertical rail grid spacing:
Recommended vertical rail grid spacing:
Installation location
4.2

Mounting process

The e:cue SYMPL Node is designed to mount onto a 35 mm DIN rail
(EN 60715) in a vertical position.
Terminals on top and bottom
No spacing necessary
115 mm (90 + 25 mm)
(excluding conduit)
160 mm (with 40 mm conduit)
Indoor
1. Clip the device to the rail from
top.
2. Gentle pressure is then
applied to the top front to snap it
in place. The SYMPL e:bus Node
has been mounted successfully.
Installation
13

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

E:bus node

Inhaltsverzeichnis