Herunterladen Inhalt Inhalt Diese Seite drucken

Steam Connection; Condensate Connection; Air Intake/Exhaust Air - Miele PDR 928 SI Installationsplan

Gewerbliche trockner dampfbeheizt
Vorschau ausblenden Andere Handbücher für PDR 928 SI:
Inhaltsverzeichnis

Werbung

en - Installation notes

Steam connection

The steam connection must only be carried out by a registered installation technician. The
information from the data plate, the wiring diagram and the documentation accompanying
the appliance must be noted and complied with when connecting steam-heated Miele ap-
pliances.

Condensate connection

The condensate separator must be installed so that when the system is not operating, the
heater bank is completely emptied. This means that no condensate may remain in the
heater bank. The installation of an inverted bucket condensate trap is recommended.

Air intake/exhaust air

The tumble dryer may only be operated when the ducting has been connected properly
and the room is sufficiently ventilated.
Accessory parts may only be fitted when expressly approved by Miele. If other parts are
used, warranty, performance and product liability claims will be invalidated.
14

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Pdr 528 siPdr 528 ropPdr 528 rop siPdr 928

Inhaltsverzeichnis