Herunterladen Inhalt Inhalt Diese Seite drucken

Technical Data; Approval And Conformity - Grohe Ondus 36 048 Montageanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1
GB
Applications
Fitting for use with concealed mounting set 36 069
in conjunction with function unit 36 067.

Technical Data

• Flow rate at 3 bar flow pressure:
Spout
Spray
• Automatic safety shut-off (factory setting):
• Safety stop (factory setting):
• Type of protection:
Electrical test data
• Software class:
• Contamination class:
• Rated surge voltage:
• Temperature for ball impact test:
The test for electromagnetic compatibility (interference
emission test) was performed at the rated voltage and rated
current.
Note:
GROHE fittings with showers are equipped with non-return
valves.

Approval and conformity

This product conforms to the requirements of the
relevant EU guidelines.
The conformity declarations can be obtained from the following
address:
GROHE Deutschland Vertriebs GmbH
Zur Porta 9
D-32457 Porta Westfalica
Installation
Refer to the dimensional drawing on fold-out page I.
I. Fitting, see fold-out page II, Fig. [1] to [5].
1. Remove the lid (A) and cut the fitting template (B) to length,
see Fig. [1].
2. Remove the flushing plug (C), see Fig. [2].
3. Seal the joint around the fitting template with a permanently
elastic material.
4. Attach the connector (D1) of the concealed mounting set to
the connector (E) of the fitting, see Fig. [3].
5. Connect the pre-assembled fitting to the concealed
mounting set (D) by inserting the pipes (F) into the
connections (G), see Fig. [4].
Ensure correct position of the connection cable!
6. Align the pre-assembled fitting horizontally and vertically
to the floor and fasten in place with washers (H) and
screws (H1), see Fig. [5].
Open hot and cold water supply and check that
connections are watertight.
7. Push the escutcheon (J) against the floor.
3
approx. 20 l/min
approx. 12 l/min
30 min
39 °C
- Fitting
IP 54
- Operating panel
IP 57
B
2
2500 V
100 °C
II. Hand shower, see fold-out page II, Fig. [6].
1. Connect shower hose (K) to the shower outlet (L) of the
fitting.
2. Screw hand shower (M) to shower hose (K).
III. Operating panel, see fold-out page II, Fig. [7] and [8].
1. Attach connector (E) of the fitting to connector (N1) of
operating panel (N) and push back into the adapter (O)
of the fitting, see Fig. [7].
2. Insert operating panel (N) into the adapter (O) and fasten
using set screws (P), see Fig. [8].
3. Fit cap (O1).
Operation
Using the operating panel
Start/Stop Button
Operational readiness of fitting. Water flow
commences following actuation of a programme
button. Repeated actuation stops water flow.
The connected outlets can be operated
simultaneously.
Pause button
Interrupts the flow of water (temperature arrow on
operating panel orange). The flow is resumed by
pressing the button again.
The fitting switches off automatically after a preset
time in pause mode (factory setting 60 s).
Temperature
Increases (red arrow, left) or decreases (blue arrow,
right) the water temperature.
The display flashes until the preset temperature
is reached.
Volume
Increases
or decreases the flow rate in a total
of eight stages.
Temperature safety button
Overriding the safety stop (factory setting: 39 °C).
The actual value is synchronised with the display at 38 °C.
See Calibrate in the section Setting mode.
Programme buttons
Drench shower head
Head shower
Side shower
Hand shower
Bath inlet
Memory button 1
Memory button 2

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis