3. Feed the projector connec�on cable and your supply
line through the components of the connector as
shown.
4. Connect the two cables to the terminal block.
5. Ensure the mains voltage matches the input voltage of
the projector as specified in the technical specifica-
�ons (220 – 240 V AC, 50 / 60 Hz) and your supply
cable is connected to a protec�ve conductor via the
corresponding contact on the terminal block.
6. Lock the sleeve with the threaded sec�ons of the
strain relief using the specified torque.
7. Screw the caps onto the strain relief using the specified
torque.
PHOS s pole mount pro
Installa�on
2.5 Nm
2.5 Nm
35 / 76