6.6 Safety checks

Electrical systems or devices must be tested for the
effectiveness of the protective measure(s) of the
system, in accordance with the nationally applicable
regulations, by the installer of the system or device
before initial commissioning. This also applies to the
expansion or modification of existing systems or elec-
trical devices. All regulations for protective measures
must be observed.
The following points must be taken into consideration:
The tests (continuity of the connections of the
k
protective conductor; insulation resistance;
RCD (FI) tripping current, tripping time, ...) must be
carried out.
The measuring devices used must comply with the
k
national regulations!
The measurement results must be documented. A
k
test protocol of the test must be created and kept.

6.7 Start-up

Apply voltage to the charging station (e.g. switch
k
on circuit breaker).
The LED status display should now flash green.
k
Check the individual functions and statuses using a
k
suitable test adapter and
Measure the correct voltages at L1, L2, L3, N and
k
PE according to the instructions of the test adapter
manufacturer.
CAUTION
Do not remove the metal housing cover or the
plastic housing cover as soon as the charging
station is under voltage.