Herunterladen Inhalt Inhalt Diese Seite drucken

Operation; Cleaning, Maintenance And Ordering Of Spare Parts - EINHELL GC-CL 18/1 Li E Originalbetriebsanleitung

Akku-universalbläser
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1
Important! The curved blower tube must be
turned as far as it will go to make sure it is fi rmly
secured in position.
5.2 Fitting the battery pack (Fig. 6/7)
Press the pushlock button (Fig. 6/ Item C) of the
battery pack as shown in Fig. and push the batte-
ry pack into the mount provided. When the battery
pack is positioned as in Fig. 7, make sure that the
pushlock button latches in place! To remove the
battery pack, proceed in reverse order.
5.3 Charging the battery (Fig. 8)
1. Take the battery pack out of the equipment.
Do this by pressing the side pushlock buttons.
2. Check that your mains voltage is the same as
that marked on the rating plate of the battery
charger. Insert the power plug of the charger
into the mains socket outlet. The green LED
will then begin to fl ash.
3. Insert the battery pack into the battery char-
ger.
4. In the section entitled „Charger indicator" you
will fi nd a table with an explanation of the LED
indicator on the charger.
The battery pack can become a little warm during
the charging. This is normal.
If the battery pack fails to charge, check:
whether there is voltage at the socket outlet
whether there is good contact at the charging
contacts
If the battery pack still fails to charge, send
the charging unit
and the battery pack
to our customer service center.
To ensure that items are properly packaged
and delivered when you send them to us,
please contact our customer service or the
point of sale at which the equipment was
purchased.
When shipping or disposing of batteries and
cordless tools, always ensure that they are
packed individually in plastic bags to prevent
short circuits and fi res.
To ensure that the battery pack provides long ser-
vice, you should take care to recharge it promptly.
You must recharge the battery pack when you
notice that the performance of the device drops.
Never allow the battery pack to become fully di-
Anl_GC-CL_18-1_Li_E-Solo_SPK9.indb 16
Anl_GC-CL_18-1_Li_E-Solo_SPK9.indb 16
GB
scharged. This will cause it to develop a defect.
Battery capacity indicator (Fig. 9)
Press the button for the battery capacity indicator
(D). The battery capacity indicator (E) shows the
charge status of the battery using 3 LEDs.
All 3 LEDs are lit:
The battery is fully charged.
2 or 1 LED(s) are lit:
The battery has an adequate remaining charge.
1 LED fl ashes:
The battery is empty, recharge the battery.
All LEDs blink:
The battery temperature is too low. Remove the
battery from the equipment, keep it at room tem-
perature for one day. If the fault reoccurs, this me-
ans that the rechargeable battery has undergone
exhaustive discharge and is defective. Remove
the battery from the equipment. Never use or
charge a defective battery.
5.4 Speed control (Fig. 1)
The device is fi tted with an electronic speed
controller. To use it, turn the speed controller (Fig.
1/ Item 4) to the desired position. Use the device
only with the speed which is actually required and
do not let it run at a speed which is faster than
necessary.

6. Operation

To switch on, press and hold the On/Off
switch (2).
To switch off, let go of the On/Off switch.
Channel the air stream forward and walk
slowly to blow the material into a pile or to
clear out hard-to-reach places.
7. Cleaning, maintenance and
ordering of spare parts
Before putting away or cleaning, switch off the
equipment and remove the battery pack.
7.1 Cleaning
Keep all safety devices, air vents and the
motor housing free of dirt and dust as far as
possible. Wipe the equipment with a clean
- 16 -
04.11.2021 10:37:21
04.11.2021 10:37:21

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

34.335.41

Inhaltsverzeichnis