Herunterladen Inhalt Inhalt Diese Seite drucken

Airwell CDMX-035N-09M25 Betriebs Und Installationsanleitung Seite 44

Vorschau ausblenden Andere Handbücher für CDMX-035N-09M25:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 86
Step 5: Fasten the control box lid with 2
screws .
Step 6: Close the intake grille, and close the
2 grille hooks.
(B)
Step 1: Remove the front grille.
1. Push both of the tabs towards the middle
simultaneously to unlock the hook on the
grille.
2. Hold the grille at a 45° angle, lift it up
slightly and detach it from the main body.
Remove the grid screws
Grille switch
Grille screw cover
Step 2: Remove the installation covers at
the four corners by sliding them outwards.
Page 43
Step 3: Install the panel
Align the front panel to the main body, taking
into account the position of the piping and
drain sides. Hang the four latches of the
decorative panel to the hooks of the indoor
unit. Tighten the panel hook screws evenly at
the four corners.
NOTE: Tighten the screws until the thickness
of the sponge between the main body and the
panel reduces to 4-6mm (0.2-0.3"). The edge of
the panel should be in contact with the ceiling
well.
Adjust the panel by turning it to the arrowed
direction so that the ceiling opening is
completely covered.
Drainage interface
louver motor
45°
Ceiling
Panel side sponge
Panel
Panel foam 1
Piping interface
Into the wind
Main body
Ba e
Out of the wind
Outlet foam
Panel foam 2

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis