Herunterladen Inhalt Inhalt Diese Seite drucken

Sauter OFL3.0 Betriebsanleitung Seite 42

Vorschau ausblenden Andere Handbücher für OFL3.0:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

8. Fixing the OFL3.0 to the Router Table
8.1 Preparations of your individual router table
(Skip this step if fixing to sauter routing tables FT)
Make the cut-out in your routing table according to the plan on page 28. Make sure
there is at least 15mm rebate to rest the lift on. Make sure that the lift plate is
aligned flush with your table. Step-by-step instructions are given below. Optional
accessories are also available (see "Accessories").
8.1.1 Method 1 - Milling of a support rebate with the sauter milling template
(Art.Nr. SA-ELP-FS) and rebate cutter (Art.Nr. E-11651) (optional accessory)
1) Position the template at the desired location on the routing table top.
2) Mark a rectangle inside the template, which is 15 mm smaller on each side.
( for the rebate = supporting surface for the insert plate).
3) Rout out completely the area marked on the router table top. For thicker panels,
perform the routing in several steps.
4) Firmly attach the template to the milling table, set the depth of the router cutter to 9.3
mm, add the template thickness, and rout with the ball bearing on the template along the
cutout.
5) Check that the rebate is deep enough. The insertion plate must be slightly below the
table top level.
Fig. 4 Required installation dimensions
on the routing table
(enlarged view page 28)
15

Werbung

Kapitel

Inhaltsverzeichnis
loading

Inhaltsverzeichnis