Herunterladen Inhalt Inhalt Diese Seite drucken

Appliance Installation; Service Information - AEG Huz 5 ÖKO Comfort Gebrauchs- Und Montageanweisung

Vorschau ausblenden Andere Handbücher für Huz 5 ÖKO Comfort:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

For contractors
Huz 5 ÖKO Comfort:
Hoz 5 Comfort:
Information regarding Hoz 5 Comfort:
2.7

Appliance installation

Huz 5 ÖKO Comfort:
The colour designation of tap connection pipes and heater must match:
Hoz 5 Comfort:
The handles
Cold water on the left (blue)
DHW on the right (red).
2.8
Commissioning
(Only to be carried out by your contractor)
Boil dry risk. The high limit safety cut-out responds if the order is confused.
!
In this case, fill up with water and briefly disconnect the appliance from the power supply.
Temperature selection limitation
mum position and push ON controller button.
Appliance handover:
gers (scalding). Hand over these operating and installation instructions to the user for safe-keeping.
2.9

Service information

Opening appliance
a Pull OFF controller button
c Lower locking screws
Wiring diagram
Positioning thermostat sensor in the protective pipe:
low the earthed plug.
Draining appliance:
Drain the appliance via the connectors.
Descaling:
ment in descaling agent up to the flange plate.
conductor contact in the power cable.
Oversink installation
C
4).
D
E
:
E
:
b Remove screws
d Pivot appliance casing open and remove.
F
A
Water connections above
B
Water connections below
3)
-
-
-
G
-
-

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Hoz 5 comfort

Inhaltsverzeichnis