Herunterladen Inhalt Inhalt Diese Seite drucken

Monty UNIVERSAL 2 Betriebsanleitung Seite 66

Elektrohydraulische reifenmontiermaschine
Inhaltsverzeichnis

Werbung

2
1
9
1
3
66
All manuals and user guides at all-guides.com
4
3
6.0-1
6.0-2
2
4
6.0-3
Maintenance
6.0 Maintenance
This tire demount unit will continue to provide maximum
working efficiency even after a long period of intensive
use as long as the operator carries out scheduled
maintenance as indicated below.
BEFORE ATTEMPING ANY MAINTENANCE OR
5
REPAIRS THE MACHINE MUST BE DISCONNECTED
FROM THE ELECTRICAL POWER SUPPLY AND THE
COMPRESSED AIR FEED LINE.
6
Every 6 months,
7
carry out:
• Grease injection for bearings, using a suitable grease
pump (Fig. 6.0-2).
on the parts:
Figure 6.0-1
9) Wheel turntable support column.
8
carry out:
• Check for any excessive increase in play
• Consult the technical assistance service
on the parts:
Figure 6.0-1
4) Horizontal slide arm of tool
7) Bead-breaker slide supports
Every 4 months,
carry out:
• Removal of accumulated dirt with non-flammable
liquid detergent.
• Restoration, using a brush, of a suitable quantity of
oil for mechanical lubrication.
on the parts:
Figure 6.0-1
1) Mobile parts of the Automatic Head.
2) Vertical slide arm of tool.
3) Slip-off rod of bead pusher tool.
4) Horizontal slide arm of tool.
5) Vertical slide rod of bead breaker.
6) Bead breaker dual position mechanism.
7) Bead breaker support slide guides.
8) Horizontal slide rod of bead breaker.
Every week,
carry out:
• Wash with cold water and soap or non-aggressive
chemical detergents.
• Dust with talc.
on the parts:
Figure 6.0-3
1) Plastic guards for wheel clamping tapers
2) Plastic guards of mount/demount tool
3) Bead breaker disc
4) Plastic guards of Wheel turntable.
Operator's Manual
monty universal 2

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Vas 6585

Inhaltsverzeichnis