Herunterladen Inhalt Inhalt Diese Seite drucken

Monty UNIVERSAL 2 Betriebsanleitung Seite 54

Elektrohydraulische reifenmontiermaschine
Inhaltsverzeichnis

Werbung

54
All manuals and user guides at all-guides.com
5.2.2-5
5.2.2-6
5.2.2-7
5.2.2-8
Operations
Note:
Stop the Bead Pusher, before it, during the
rotation, comes into contact with the safety
pin (Figure 5.2.2-5).
• Activate the tool control valve lever to lift the bead
and start the rim extraction (Figure 5.2.2-6).
Note:
During this phase the turntable must not
be rotated.
Activate the clockwise rotation and at the
same time press on the side of the tyre to
keep the bead in the channel, until the bead
extraction has been completed (Figure
5.2.2-7).
5.2.2.3
Lower bead extraction
Procedure:
• Use the demounting tool control lever to bring it in
the maximum extension position.
• manually lift the tyre, hook it to the tool, keeping on
the opposite side, the bead in the rim channel.
Note:
For this positioning you can use the bead
breaker (Figure 5.2.2-8).
• Use the demounting tool control lever to lift the bead
out of the rim edge
• Rotate the turntable until the tyre is completely
removed.
Operator's Manual
monty universal 2

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Vas 6585

Inhaltsverzeichnis