Herunterladen Inhalt Inhalt Diese Seite drucken

Final Assembly - Vetus BOW THRUSTER BOW5512D Bedienungshandbuch Und Einbauanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 17
4 .3

Final assembly

• Grease the propeller shaft with 'outboard gear grease' and install
the propeller.
The propeller should run a minimum of 1 .5 mm (
thrust tube wall, all round .
• Slide the flexible coupling onto the output spindle of the electric
motor as far as necessary to allow the end of the output spindle
(A) and the underside of the flange (B) to become aligned.
• Tighten the lock­screw (C).
• Grease the input shaft with an installation compound, like 'Mo­
lykote® G­n plus' .
• Grease the threads of the fastenings bolts with 'outboard gear
grease' and install the electric motor to the intermediate flange.
• For a first check, turn the propeller by hand, it should turn easily,
whilst being connected to the output spindle of the electric mo­
tor.
vetus® Operation manual and installation instructions bow thrusters BOW5512D and BOW5524D
1
/
") free of the
16
ENGLISH
Outboard Gear
Grease
M6
10
2 Nm
(1.5 ft.lbf )
M5
2.5
(2.2 ft.lbf )
3 Nm
Outboard Gear
Grease
M8
6
12 - 15 Nm
(9 - 11 ft.lbf )
Molykote® G-n plus
020522.10
13

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Bow thruster bow5524d

Inhaltsverzeichnis