WARNING! The internal connection diagrams of the generators are reported in the manual of the voltage
regulator.
Fix the output cables to the terminals of the generator, as shown in Figure 6:
Rotation direction
The generators are usually provided to work with a clockwise rotation (from the coupling side).
Ground connection
The terminal box contains a terminal for ground connection while a second terminal is located at the foot of the
generator. Connect the ground connection with an appropriate copper conductor, in line with the regulations in
force.
5.7 Single-phase loads
The three-phase generators of this series can be used as single-phase generators when following the
indications reported here below:
The generator can be used at a maximum power of 0.6 times the rate reported on the plate for the three-
phase load.
The generator can be connected to the parallel star (220 Volts at 5Hz required or 220-24V at 6Hz) and the
single phase must be connected to terminals U1/T1 and V1/T2.
W5
T9
The generator can also be connected in a zig zag (220-240 Volts at 5Hz required or 220-24V at 6Hz) and the
single-phase load must be connected to terminals U1/T1 and V1/T2.
963857253_=
CABLE MARKERS
V1
W1
U2
V2
T2
T3
T4
T5
LINE
YES
Collegamento stella parallelo
Parallel star connection
U1
U5
T1
T7
LOAD
CARICO
T4 U2
U6 T10
W6
V2
T12
T12
V1
W2
V6
T2
T6
T11
W1 T3
V5 T8
W2
U5
V5
T6
T7
T8
WINDING
U6
(T10)
U2
(T4)
W5
(T9)
V5
(T11)
(T5)
V6
(T3)
W1
V1
V2
W6
(T12)
W2 (T6)
110 V
W5
U6
V6
T9
T10
T11
LINE
NO
Fig. 6
BIANCO-WHITE
NERO-BLACK
ROSSO-RED
(T8)
U5
(T7)
(T2)
U1
(T1)
220 V
Fig.7
W6
T12
35

Werbung

loading