Herunterladen Inhalt Inhalt Diese Seite drucken

Inspection; Repairs; Additional Information; Disposal - Nova MONTIS+ Handbuch

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

_66

Inspection

Every 24 months (two years) or every 150 Operating hours, the harness
must have a NOVA Full Service. During the service, the entire harness will
be checked for possible damage.
You can locate NOVA Full Service partners here www.nova.eu/en/try-buy/

Repairs

Please do not attempt repairs on your harness. Repairs should only be performed
by an authorised service centre.

Additional information

• The carabiners must be replaced after 1500 Operating hours or five years (whi-
chever comes first)
• The screwgate carabiners must be completely closed before they are subject
to any load. This also applies when the harness is adjusted while on the ground.
Loading the carabiners or maillons when they are open can lead to irreparable
damage.

Disposal

The synthetic materials used in the construction of a harness should be respon-
sibly disposed of. When you wish to dispose of your harness, please return it to
NOVA or to your local NOVA partner, where it will be dismantled into its individual
components and properly disposed of.

Technical Data

M
Pilot height
cm
<175
175-190 >185
Volume
l
60
60
Harness weight
kg
1,305
1,325

Certification

PH 131.2015 (EN & LTF)
Maximum clip-in weight
130 kg LTF / 100 kg EN
Energy absorbtion value
g
26
Colour
NOVA Red/Black
Materials (Montis)
Webbing
Dyneema
Shoulder strap
Friction Buckle
Carabiner
NOVA Foras
Airbag (optional)
NOVA INVERTO
Certification
In accordance with LTF 91/09 the MONTIS is tested and certified for an all-up
weight of 130kg and according to EN 1651 an all-up weight of 100kg.
_67
L
XL
M
L
<175
175-190
60
1,385
0,320
0,340
0,400
PH 131.2015 (EN)
130 kg LTF / 100 kg EN
NOVA Red
_EN
XL
>185

Werbung

Kapitel

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

MontisInverto

Inhaltsverzeichnis