1. Clean the selected setup location by sweeping away stones and other solid objects.
2. Set up the heat pump
3. Lay the hoses from the water treatment system to the setup location of the heat
pump (see Fig. E).
Make sure that there is no tension on any of the lines routed to the heat pump and
that they are not in the way.
4. Lay the supply line for the heat pump's power supply (see "Technical data" section).
Use an extension cord or a socket with the required protection class for the
environmental conditions of the connection site!
5. Lay a drain line (13-mm, 1/2" garden hose) to a floor drain, collection tank or
absorbent ground for the condensation water that results from the cooling process.
Without a drain line, the condensation water drains from the drain connection
piece
directly onto the ground where the heat pump is set up.
5
6. Mark the drilling locations for the ground anchors through the holes in the feet of
the heat pump (see Fig. D).
7. Remove the heat pump from the setup location.
8. Install ground anchors that are suitable for the heat pump.
Block off the installation site in a clearly visible way as long as the heat pump is not
mounted on it to prevent accidental tripping over the ground anchors protruding
from the ground.
56
exactly as it will be installed later.
1