Herunterladen Inhalt Inhalt Diese Seite drucken

Atlantic F117 Design Bedienungsanleitung Seite 6

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 9
The product you have just purchased has undergone numerous tests and inspections to guarantee the highest quality. We hope it will give you entire
satisfaction.
'absence de
INSTALLATION OF THE PANEL HEATER
Please read the instructions before starting to install the heater. Disconnect
al ou du non
the power before carrying out any work on the heater. Keep these
instructions even once you have installed your heater.
s cachés qui
1) Where to install your heater ?
- This equipment was designed to be installed in a residence. Please ask your
_________
distributor before using it for any other purpose.
- The panel heater should be installed according to normal trade practice and in
_________
compliance with legislation in the relevant country (the IEE Wiring Regulations).
_________
- The equipment is class 2
24. The device is to be installed so that switches and other controls cannot
be touched by a person in the bath or shower, except in the UK where IEE
Regulations 701.512.2 and 701.512.3 apply. These allow the use of IP24
rated products and their integral controls in Zone 2 and outside zones. a
- Comply with the minimum clearance distances for positioning of the panel
heater. b
- If your wall covering is laid on foam, a spacer the same thickness as the
foam must be placed under the panel heater's support. This ensures there is
free space behind the panel heater to make sure its control settings are not
adversely affected.
- Do not install the panel heater:
c
In a draught that might affect adjustment (for example, under a
central mechanical ventilation unit etc...).
c
Under a fixed mains power socket.
c
In zone 1 of bathrooms a.
It is forbiden to install vertical product in horizontal position.
2) How to install the panel heater ?
2-1) Release the appliance's hook-on bracket
We recommend that you place the radiant panel flat, face down.
Have a straight head screwdriver to hand.
2-2) Fix the hook-on bracket
Use the wall-mounting bracket as a template for positioning the heater.
Drilling points A
Drilling points B
2-3) Connecting the panel heater
- The appliance should have a 230-240V 50Hz power supply.
- The panel heater must be connected to the mains, either by a 3-wire cable
(Brown= Phase, Blue = Neutral, Black = Pilot wire) by means of a connexion
box.
In humid areas such as bathrooms and kitchens the power socket must be
installed at least 25 cm above the floor.
- The installation should be fitted with a double pole break device with a break
of at least 3 mm.
- Connection to earth is prohibited. Do not connect the pilot wire
(black) to earth.
- The heater must be installed by a qualified electrician in accordance with
the local regulations. The heater and the pilot wire (black) must NOT be
connected to earth. If the power cable is damaged, it must be replaced by
the manufacturer or its after-sales service Department or a similary qualified
person to avoid any risk.
If a pilot or piloted panel heater is protected by 30mA differential (e.g.
bathroom) the pilot wire's power must be protected on this differential
F117_electro_1280-1432.indd 7
Downloaded from
www.Manualslib.com
and is protected against splashed water IP
manuals search engine
Complete
Commands
No current
altermation
Received
230 V
Oscilloscope
Réf/Neutral
Mode
COMFORT
ECO
obtained
2-4) Lock the appliance on the hook-on bracket
USING THE PANEL HEATER
1) Description of the control unit : 
g
switch
.
1
g
Temperature adjustment control knob.
2
g
V1
Heating indicator light
2) Fixing the comfort temperature
The comfort temperature is the temperature that you would like while the
room is occupied.
a) Put the 1 switch to
.
b) Ajust the control knob 2 to the wished position, the heating indicator V1
comes on if the room temperature is below the required temperature.
c) Wait a few hours for the temperature to stabilise.
d) If the setting is satisfactory (if necessary use a thermometer to check),
mark the position for future use.
e) If the setting is not satisfactory, adjust it and start again from point c.
3) Fixing the Eco temperature :
This is the required temperature during periods when the room is
unoccupied. It is recommended that this mode should be used if the room is
unoccupied for more than 2 hours.
a) Set the cursor 1 switch knob to
b) Ajust the control knob 2 to the wished position, the heating light V1
comes on, if the ambient temperature is lower than the instruction of desired
Eco temperature.
c) Wait a few hours until the temperature stabilizes.
d) If the setting is satisfactory (if necessary use a thermometer to check),
mark the position.
If the setting is not satisfactory, adjust it and start again from point c.
Note : When switching n°1 (on the picture) is set on Programming system
(clock symbol) with the PassProgram On/Off, please refer to paragraph n°8.
Négative
Positive
Half/altermation
Half/altermation
- 115 V
+ 115 V
STOP
ANTI-
HEATING –
FREEZE
LOAD
SHEDDING
f
.
01/04/11 11:57

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis