Herunterladen Inhalt Inhalt Diese Seite drucken

Oase AquaMax Eco Titanium 31000 Gebrauchsanweisung Seite 24

Vorschau ausblenden Andere Handbücher für AquaMax Eco Titanium 31000:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1
- EN -
Turning the pump casing to achieve a different position
If necessary, the pump casing can be turned to change the position of the pump outlet by 90°.
AquaMax Eco Titanium 31000
How to proceed:
 J
1. Remove both screws from the EGC box on the pump base in order to hinge the box to the side.
2. Undo the screw at the pump base but do not unscrew it completely, then pull off the pump.
3. Remove the four screws and take off the pump casing.
4. Turn the pump casing counterclockwise through 90°, fit it onto the motor and fasten with four screws.
– The pump casing can only be mounted in the two positions indicated.
5. Push the pump onto the pump base and tighten the screw.
6. Hinge the EGC box underneath the pump base and fasten with both screws.
AquaMax Eco Titanium 51000
How to proceed:
 K
1. Remove the screws and remove the pump from the stand.
2. Remove the four screws and take off the pump casing.
3. Turn the pump casing counterclockwise through 90°, fit it onto the motor and fasten with four screws.
– The pump casing can only be mounted in the two positions indicated.
4. Place the pump on the stand and fasten with the screws.
Connection
Integrating the pump in the EGC network
 M
As an option, the pump can be integrated in an EGC network. In an EGC network, the InScenio FM-Master EGC or
InScenio EGC-Controller and all EGC-compatible devices are connected by means of a Connection Cable EGC. A ter-
minal resistor has to be fitted to the EGC-OUT of the last EGC compatible unit in order to terminate the network.
 The EGC connection cable is available as an accessory in the lengths 2.5 m (47038), 5 m (47039) and 10 m (47040).
 Ensure the correct connection.
How to proceed:
 C, D, L
1. Remove the protection cap from EGC-IN.
2. Fit the plug connector of the ECG connection cable and secure with the two screws (max. 2.0 Nm).
– Ensure that the rubber seal is clean and fits exactly.
– Replace the rubber seal if damaged.
3. Remove the protection cap from EGC-OUT, fit the terminal resistor and secure it with the two screws (max. 2.0 Nm)
or another EGC compatible unit.
– No Connection Cable EGC is connected to EGC-OUT on the last unit in the EGC network. The terminal resistor
has to be fitted to this EGC-OUT so that the EGC network is correctly terminated.
– The terminal resistor is included in the delivery scope of the InScenio FM-Master EGC or InScenio EGC Control-
ler.
24

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Aquamax eco titanium 51000

Inhaltsverzeichnis