Herunterladen Inhalt Inhalt Diese Seite drucken

Replacement Parts - Contracor CAB-110P Bedienungsanleitung

Strahlkabinen
Vorschau ausblenden Andere Handbücher für CAB-110P:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

electricity. The cabinet must be grounded to prevent static build-up. See Sections 4.1.
If shocks persist, the operator may be building up static. Attach a small ground wire
(such as a wrist strap) from the operator to the cabinet.
6.12.2 Avoid holding parts off the grating. Static will buildup in the part if not dissipated
through the metal cabinet.
6.13. Dust leaking from dust collector
6.13.1 Damaged or loose cartridge. Inspect ilter cartridge.
6.13.2 Faulty seal on the dust collector door. Inspect seal and replace if damaged.

7. Replacement parts

7.1. Blast machine assembly
Picture 13. Blast
machine, assembly
drawing
26
20
6
9
11
13
29
28
4
3
7
8
10
12
14
CAB-110P/CAB-135P Art. 15205/15206
CONTRACOR
®
27
5
23
24
25
21
30
22
18
28
17
16
2
19
1
15

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Cab-135p1520515206

Inhaltsverzeichnis