Herunterladen Inhalt Inhalt Diese Seite drucken

FITFIU FITNESS GYM-300 Betriebsanleitung Seite 34

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 39
STEP 5
1.
Attach the Butterfly Support frame (18) to
Main Frame (02) using X2 Hex Bolt (30),And
X4 washer (34) and X2 Nylon (38).
2.
Connect the Butterfly Arm Left (10L) to the
Butterfly Support Frame(18) with X2 Powder
Metal Ring (31) ,X1 washer(35) and X1
Nylon Nut(39). Do the same procedure for
the Butterfly Arm L (10R) to to the Butterfly
Support Frame(18) by same parts.
3.
Install X2 Pulley Bracket(17) to Main
Frame(02) tighten by X 2 Hex Bolt(24) ,X4
washer (34) and X2 Nylon Nut(38).
STEP 6
1.
Attach the Pull Unit(09) to the Base Frame(01)
tighten by X1 Axle for pull unit (19), X4 Powder
Metal Ring (31),X2 washer (35) and X2 Nylon
Nut(39).
2.
Connect the Push arm(69) to the Pull
Unit(09) tighten by X 2 Hex Bolt (81) ,X4
washer (34) and X2 Nylon Nut(38). Do the
same procedure for the other side.
3.
Insert the Handle bar(11) into the Push arm
and securely tighten with X3 hex bolt (22)
and X1 washer (33).Do the same procedure
for the other side.
34

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis