Herunterladen Inhalt Inhalt Diese Seite drucken

Reactor Installation - Delta UV EA Serie Installations- Und Wartungshandbuch

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

D. REACTOR INSTALLATION
The DELTA UV unit comes with all internal components fully assembled and ready for installation.
Your DELTA UV unit will need to be plumbed into your pond or swimming pool circulation
Reminder: We recommend the presence of a by-pass.
The inlet for the water is at the bottom of the DELTA UV unit.
The SOLID COLOR union tail piece is used on the BOTTOM union.
The outlet for the water is at the top.
The CLEAR union tail piece is used on the TOP union.
Also packed with your Delta unit are two white gaskets that are used to complete the Inlet/Outlet unions.
1) Install the union tail pieces by screwing them into the union nuts on the Delta unit.
2) DO NOT OVERTIGHTEN (hand tightening is sufficient). Overtightening will break the
union nuts.
ELECTRICAL BONDING (GROUNDING)
DANGER: RISK OF ELECTRIC SHOCK. Connect only to a circuit
The unit should be installed and grounded by a professional service
technician or similar person, qualified in electrical equipment installation
Delta_EA_(Multi).docx, version D, édition du 06/11/2013
Copyright DELTA UV
Marque, Modèles et Brevets déposés - Produits exclusifs
Inlet / Outlet Unions
Heating
(swimming
pool)
FILTER
PUMP
THE EQUIPMENT MUST BE IMPERATIVELY
SLAVED TO THE FILTRATION.
ALL components (pump, filter, EA unit) MUST
BE ELECTRICALLY BONDED TO A COMMON
GROUND.
protected by a Ground Fault Circuit Interrupter.
OUTLET
VALVE
BY-PASS
VALVE
INLET
VALVE
system.
.
Page 23/66

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis