Herunterladen Inhalt Inhalt Diese Seite drucken

Reactor Installation - Delta UV ELEKTRA UV Installations- Und Wartungsanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 54
C. REACTOR INSTALLATION
The Elektra UV unit comes with all internal components fully assembled and ready for installation.
Only the Inlet/Outlet unions and pressure gauge need to be installed to ready your unit for installation.
Your Elektra UV unit will need to be plumbed into your pond or swimming pool circulation
system.
We recommend the presence of a by-pass.
The inlet for the water is at the bottom of the Elektra UV unit.
The SOLID COLOR union tail piece is used on the BOTTOM union.
The outlet for the water is at the top.
The CLEAR union tail piece is used on the TOP union.
1) Install the union tail pieces by screwing them into the union nuts on the Elektra UV
unit.
2) DO NOT OVERTIGHTEN (hand tightening is sufficient). Overtightening will break the
union nuts.
Your Elektra UV unit comes with a pressure gauge that is used to confirm that your pump is not
exceeding the 2,7 Bar (40 psi) maximum working pressure.
To install the pressure gauge, screw it into the threaded tap on the clear union tail piece that you
have installed on the Elektra UV unit. Use Teflon to ensure the sealing of the system.
V5 Elektra E et ES Anglais.doc
Marque, Modèles et Brevets déposés - Produits exclusifs
Inlet / Outlet UNIONS
Heating
(swimming
pool)
FILTER
PUMP
INSTALLING PRESSURE GAUGE
OUTLET
VALVE
BY-PASS
VALVE
INLET
VALVE
Copyright DELTA UV
Page 6

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

E serieEs serie

Inhaltsverzeichnis