Herunterladen Inhalt Inhalt Diese Seite drucken

Teuco LIGHT XXL MFNP S6-C Vorinstallationsanleitung Seite 11

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 19
12 min
I
DIMENSIONS
A
B
P
1500
1300
1290
1900
1300
1290
M M
625+M
625+M
50
50
885
885 + M
+ M
520±5
520±5
90°
90°
D
- Fitting for UP sauna power supply (corrugated pipe Ø25 mm).
E
- Predisposed water connection for the integrated shower head
(corrugated pipe Ø 40 mm).
F
- Predisposed connection to chromotherapy controls (corrugated pipe Ø25).
G - Ready for mains connection for chromotherapy / audio (optional) (cor-
rugated pipe Ø25 mm).
H
- Predisposed electrical connection for an AUX socket (optional) (cor-
rugated pipe Ø25 mm).
T
- Predisposed connection for the boiler discharge (corrugated pipe Ø32 mm).
I
- Entrance width to the shower cabin.
90°
90°
+8
L
A
(Measurements in mm)
L
±2
1490
±2
550 ±5
±2
1890
±2
650 ±5
50
50
M
M
-8
I
P - L - Maximum overall dimensions of the shower cabin.
M - Covering thickness.
- Hot water connection for ¾" tap fitting.
- Cold water connection for ¾" tap fitting.
Note. The areas (N) must be finished with integral masonry.
Note: always use the discharge u-bend (O) with sauna drainage supplied
with the pre-installation kit.
Note: the level surface (Z) must be always available on the supporting
area of the box.
Left Version
Measurements in mm
O
Ø40
EN
11

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Light xxl mlnp s7-cLight xxl k221

Inhaltsverzeichnis