Installation of hanging bolt
Use M10 hanging bolts (3 pcs, locally procured).
Matching to the existing structure, set pitch according to size in the unit external view as shown below.
New concrete slab
Install the bolts with insert brackets or anchor bolts.
(Blade type
(Slide type bracket)
(Pipe hanging
bracket)
anchor bolt)
Steel frame structure
Use existing angles or install new support angles.
Hanging bolt
Hanging bolt
Existing concrete slab
Use a hole-in anchors, hole-in plugs, or a hole-in bolts.
Installation of Flow Selector unit
Treatment of ceiling
The ceiling differs according to structure of building.
For details, consult your constructor or interior finish contractor.
In the process after the ceiling board has been removed, it is important to reinforce ceiling foundation (frame) and
to keep horizontal level of installed ceiling correctly in order to prevent vibration of ceiling board.
• Attach the nuts and the M10 flat washers to the hanging bolt.
• Put washers at up and down of the hanging bracket of the Flow Selector unit to hang down the Flow Selector
unit.
• Check that four sides are horizontal with a level gauge. (Horizontal degree: Within 5 mm)
Unit
EN-45
Rubber
Anchor bolt
Support angle
Hanging bolt (W3/8 or M10)
M10 flat washer (Accessory)
50 mm or less
M10 flat washer (Accessory)
Nut (W3/8 or M10)
23

External view

Liquid pipe
Discharge gas pipe
Suction gas pipe
Refrigerant pipe connecting port
outdoor unit side
RBM-Y1124FE
RBM-Y1804FE
120
79
94
180
RBM-Y2804FE
120
79
94
180
Liquid pipe
Gas pipe
Refrigerant pipe connecting port
Control Box
494
(Hanging bolt pitch)
425
(Unit external dimension)
36
120
(Bottom side)
564
(Hanging bolt pitch)
495
(Unit external dimension)
36
120
(Bottom side)
(Unit:mm)
indoor unit side
Upper side
62
60
19
(Hang-up
94
plate bottom)
Upper side
62
57
19
(Hang-up
plate bottom)
EN-46

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Rbm-y1804feRbm-y2804fe

Inhaltsverzeichnis