Herunterladen Inhalt Inhalt Diese Seite drucken

Scope Of Delivery - Helios KWL 45-160 WH Montage- Und Betriebsvorschrift

Wandeinbauhülse
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Installation and Operating Instructions
EN
ATTENTION
CHAPTER 3

SCOPE OF DELIVERY

Wall installation sleeve – KWL 45-160 WH/WH-L
2 .4
Storage
It is recommended to leave the product in the original packaging. When storing for a prolonged time, the following steps
are to be taken to avoid damaging influences:
Protection by dry, airtight and dust-proof packaging (plastic bag with desiccant and humidity indicators). Vibration-free,
water-tight and constant-temperature storage at a temperature between -20 °C and +40 °C.
Leave the delivery in the packaging until just before mounting or installation in order to prevent any possible damage
and contamination.
2 .5
Driving rain impermeability
The wall installation sleeve seal to the building facade must be made impermeable to driving rain on site by
means of suitable measures . The facade panel is a visible part and it does not serve as a safeguard against
driving rain .
3 .0
Scope of delivery
The delivery includes the Wall installation sleeve KWL 45-160 WH/WH-L incl. installation material.
ò
Wall installation sleeve
– KWL 45-160 WH
Length 500 mm
– KWL 45-160 WH-L
Length 800 mm
Condensate wedge
ù
– for condensate drain
– with labelling "bottom centre"
ä
Protective cover
– 2 pcs
– to prevent contamination of the wall installation sleeve
Installation wedge
ë
– 6 pcs (as a block)
– for fixing the wall installation sleeve in the core hole
3 .1
Dimensions
All dimensions in mm
8
Supply air/Extract air
Wall mounting sleeve ø 160
(Core hole
(Core hole
3
ò
ä
ù
ë
ø 162 with outward gradient)
ø 172 horizontal)
Fig .1
Fig .2

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Kwl 45-160 wh-lKwl ecovent verso

Inhaltsverzeichnis