Herunterladen Inhalt Inhalt Diese Seite drucken

Cleaning - Helios KWL HB serie Montage- Und Betriebsvorschrift

Kwl-hygrobox
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Installation and Operating Instructions

20.2 CLEANING

Screws/cover
Schrauben, Deckel
KWL Hygrobox KWL HB.. EH/WW
Netzstecker
Mains plug
38
Maintenance may only be performed by expert personnel.
Once the Service display message appears, the following
tasks should be performed:
1. Before opening the device, pull out the mains
plug and secure against reactivation.
Never look directly into the lit UVC light source
without eye protection.
2. Remove both screws on the device cover and lift the
cover.
Sharp plate edges (risk of injury).
3. Fold down the front panel of the casing and lift the
inner cover.
Only handle the rotor with gloves, the blades
have sharp edges (risk of injury).
Cover electronic components with plastic film to protect
against moisture in the following work steps.
4. Lift out the rotor. (If the motor coupling jams, carefully
turn the rotor into the right position by hand).
EN

Werbung

Kapitel

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Kwl hb 250 ehKwl hb 250 s wwKwl hb 500 s ww

Inhaltsverzeichnis