Herunterladen Inhalt Inhalt Diese Seite drucken

SATA AE5501 Gebrauchsanweisung Seite 49

3.5t unterirdischer lagertyp kleine scherenhegemaschine
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 59
4.2 Test
No-load test:
- Switch on the power switch
- Press the "Up" button, and observe whether the two platforms of main lift rise stably and synchronously.
- Observe whether the highest position limit of the platforms is precise and reliable.
- Press the "Lock" button, then observe whether the safety jaws get in place precisely.
- No person or article shall be on or near the lift or within specified areas during the test. Shut down the machine in time if any abnormality
is found, and retest it after troubleshooting.
Load test:
- Drive the vehicle not exceeding the maximum lifting capacity onto the platform and apply the parking brake tightly. The person in the
vehicle shall leave the vehicle and the platform.
- Press the "Up" button to lift the platforms of the main lift and observe whether the two platforms of main lift rise stably and
synchronously.
- Inspect the lift frame and the hydraulic pump unit for the abnormal sound.
- Observe whether the highest position limit of the platforms is precise and reliable.
- Press the "Lock" button, then observe whether the safety jaws get in place precisely.
- During the load test, no person or article shall be on or near the lift, within specified areas or in the vehicle, and the vehicle weight shall
not exceed the maximum lifting capacity of the lift. Inspect the oil circuit and pneumatic circuit for oil or air leakage. Shut down the
machine in time if any abnormality is found, and retest it after troubleshooting.
AE5501/AE5501-3
中文
EN
DE
RU
KO
PT
JA
ES
49

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Ae5501-3

Inhaltsverzeichnis