Herunterladen Inhalt Inhalt Diese Seite drucken

Maintenance - SUHNER LXB 10-DH Originalbetriebsanleitung

Vorschau ausblenden Andere Handbücher für LXB 10-DH:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1
Therefore please observe the following
• Operating with dirty and unlubricated air reduces tool
life substantially.
Before installing extension hoses, blow them clean and
minimize, if at all necessary coupling and keep them
clean.
• Conserve:
Put some drops of oil in the air inlet and briefly blow
through.
Safety Instructions
• Do not exceed max. operating speed of tool and clam-
ping element.
• Observe accurate mounting of insert tools.
• Observe mounting instructions for Mounted Stones!
• Run tool for a couple of seconds under no load,
replace vibrating insert tools at once, Protect mounted
points from knocks and grease.
• Secure work, use clamps or a vise to hold work.
• The grinder operator shall wear safety goggles or face
shield and gloves and earplugs at all times when the
grinder is in operation.
• If noise level exceeds 85 dB(A) at the work station,
operator must use ear plug and/or ear mufflers.
For additional safety instructions refer to enclosed bro-
chure DL 39 220 01.
Operation conditions and instructions
Safety lever throttle action
This tool is equipped with a combination safety lever/ring
throttle. The machine can be turned on and off by turning
the lever.
1.
A)
Turn locking lever in direction indicated by arrow, and
Depress valve lever
2.
B) Turn ring throttle counter clock wise to open turn clock
wise to close. Observe arrow direction.
Attention: Before connecting to air supply, check that
throttle is closed.
Grinding/Cleaning
Do not treat any material containing asbestos.
Change of tools/abrasives
• Disconnect air supply before changing tools/abrasives
• Lock spindle with jaw spanner 6 and loosen/ tighten
tool by hand.
• Check concentricity, use only vibration free tools and al-
ways observe M.O.S. (Max. operating speed). Observe
mounting instructions for Mounted Stones!
4

Maintenance

• Store tool in a clean, dry place. Check the idling speed
from time to time.
• Even if the tool still gives satisfactory service, have it
checked by a trained mechanic after 300 to 400 opera-
tion hours, or at least once a year. Disassembly motor,
clean and replace if necessary the four vanes.
Also check/replace grease (Isoflex NBU15) in the gear
head 1.
• Warranty claims can only be considered, if tool is retur-
ned complete.
Accessories
All accessories can be found in the
Power Tool catalog.
Subject to change.
Abrasive

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis