Herunterladen Inhalt Inhalt Diese Seite drucken

Installation; Unpacking; Location; Leg Assembly - Hatco FSHACH Serie Installations- Und Bedienungshandbuch

Heated air curtain cabinets
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 17

INSTALLATION

UNPACKING

The Flav-R-Savor ® Heated Air Curtain Cabinets are shipped
with most components installed and ready for operation. The
following installation instructions must be performed before
plugging in and operating the cabinet.
WARNING
Do not lay unit on the side with the control panel or
damage to the unit could occur.
WARNING
To prevent any injury or damage to the unit do not pull unit
by power cord.
1. Remove unit from box.
2. Remove information packet. To prevent delay in
obtaining warranty coverage, fill out and mail in the
warranty card.
3. Remove tape and protective film from all surfaces of unit.
If installing the optional Back-to-Back Mounting Kit, see
ACCESSORIES for installation instructions.

LOCATION

WARNING
For safe and proper operation, the unit must be located a
reasonable distance from combustible walls and
materials.
If
safe
distances
discoloration or combustion could occur.
CAUTION
To avoid any injury or damage locate the Cabinet at the
proper counter height, in an area that is convenient for
use. The location should be level to prevent the unit or its
contents from accidentally falling, and strong enough to
support the weight of the unit and food.
CAUTION
The National Sanitation Foundation (NSF) requires that
units over 914 mm (36") in length or weighing more than
36 kg (80 lbs.) to be either sealed or raised on the
installation surface. If this unit cannot be sealed at the
point of use, 102 mm (4") legs are included to allow for
proper cleaning access below unit.
CAUTION
The unit (humidified units only, FSHACH-2 and FSHACH-3)
must be transported in an upright position to avoid
personal injury and damage. If laid on its side, the water
must be drained from the unit.
NOTE: The unit must be transported in the upright position.
Water must be drained from the unit. See DRAINING THE
RESERVOIR in the MAINTENANCE section.

LEG ASSEMBLY

Models FSHAC-3 and FSHACH-3 are equipped with 102 mm
(4") legs.
NOTE: Additional help may be needed to maneuver unit to the
proper position for installing legs.
1. Place unit Cabinet opening facing up.
2. Attach legs by turning leg clockwise on the bottom of the
unit (See 6 ). Repeat on the remaining legs.
3. Position Cabinet upright and move to the desired operating
location.
Form No. FSHACCEM-0807
are
not
maintained,
10
PLUMBING (Humidified Models FSHACH-2,
FSHACH-2PT and FSHACH-3 Only)
WARNING
For proper plumbing installation conforming to local
plumbing codes, consult a licensed plumbing contractor.
CAUTION
To assure proper operation and to avoid damage to the
unit, the incoming water supply pressure must be at least
241 kPa (35 psi) and not to exceed 552 kPa (80 psi).
CAUTION
To assure proper operation and to avoid damage to the
unit, the incoming water supply temperature must not
exceed 60°C (140°F).
NOTICE
Water Quality Requirements - Incoming water in excess of
.75 grains of hardness per liter (3.0 grains of hardness per
gallon (GPG)) must be treated and softened before being
used. Water containing over .75 GPL (3.0 GPG) will
decrease the efficiency and reduce the operating life of the
unit.
NOTICE
To assure proper operation and extend the life of
humidified models utilizing the auto-fill system, the water
filter cartridge must be installed in the water supply line.
NOTICE
Do not use de-ionized water. De-ionized water will greatly
shorten the life of the water heating elements and
plumbing components.
Auto-Fill Installation
NOTE: Water inlet and drain connections must be made with
flexible hose. If required, a ball valve or gate valve, line strainer,
union(s) and vacuum breaker or other anti-siphon device must
be supplied by plumber or installer.
Materials required for installation include plumbing tape or pipe
sealant, and appropriate fittings for application.
1. Turn off water supply.
NOTE: Install filter cartridge with flow arrow towards the
equipment. (See 7 )
2. Insert water supply tubing fully into filter cartridge. Secure
tubing to water filter cartridge with fittings. (Filter supplied
by Hatco, Part No. 03.05.079.00.)
3. Attach minimum tubing length from filter cartridge to
equipment. Secure tubing with fittings.
4. Connect filter cartridge assembly to equipment water
supply inlet. (See 8 )
5. Tighten connections securely.
6. Turn water supply on. Check for leaks before leaving
installation.
NOTE: Flush new filter cartridge with water for five minutes
before use.
See MAINTENANCE section for Filter Cartridge Replacement.
A drain connection is located inside the cabinet cavity for
manually
draining
(See 9 ) A male hose connector is included. See
MAINTENANCE for draining information.
the
water
reservoir.

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis