Approval and conformity
This product conforms to the requirements
of the relevant EU guidelines.
The conformity declarations can be obtained
from the following address:
GROHE Deutschland Vertriebs GmbH
Zur Porta 9
D-32457 Porta Westfalica
Installation
Grease O-rings with the special grease supplied
prior to installation.

Electrical installation

Electrical installation work must only be
performed by a qualified electrician. This
work must be carried out in accordance with
the regulations according to IEC 364-7-701-1984
(corresponding to VDE 0100 Part 701) as well
as all national and local regulations.
Pre-assemble operating panel see fold-out page II, Fig. [1].
Fit escutcheon and install function unit,
see Figs. [2] and [3].
Install spout, see Figs. [4] and [5].
Attach battery unit, see Fig. [6].
Install operating panel, see Figs. [7] and [8].
Insert batteries with correct polarity.
Install pop-up waste (65 807), see fold-out page I.
Seal plug-hole rim.
Connect voltage supply, see Fig. [10].
Settings during a power failure / when changing batteries
No settings saved by the user will be lost when changing the
batteries or in the event of a power failure.
Flush piping system prior and after installation of fitting
thoroughly (Consider EN 806)!
Connect fitting, see Figs. [9] and [10].
The cold water supply must be connected on the right,
hot water supply on the left.
Open hot and cold water supply and check connections
for watertightness.
3

Operation

Using the operating panel
Start/Stop button
Starts and stops the fitting at a preset temperature
(factory setting 38 °C) and full flow rate.
Pause button
Interrupts the flow of water. The flow is resumed
by pressing the button again.
The fitting switches off automatically after a preset
time (factory setting 60 s).
Temperature
Increases (red arrow, left) or decreases
(blue arrow, right) the water temperature.
Volume
Increases
or decreases the flow rate in a total
of four stages.
Define start temperature
Press and hold the button for 10 seconds
=> 3 water pulses
Adjust until optimum temperature is reached
=> 3 water pulses

Maintenance

Inspect and clean all components and replace if necessary.
Disconnect voltage supply.
Shut off hot and cold water supply.
Disconnect all plug-in connectors, see Fig. [10].
I. Change battery, see Fig. [11].
The battery must be replaced 10 years after commissioning
the fitting, at the latest.
II. Replace thermistor, see Fig. [12].
1. Disconnect plug-in connector (A).
2. Unscrew nut (B) and pull out thermistor (C).
III. Mousseur (48 009), see fold-out page I.
Install in reverse order.
Replacement parts
See fold-out page I (* = special accessories).
Disposal note
Dispose of batteries in accordance
with national regulations.