Herunterladen Inhalt Inhalt Diese Seite drucken

Connecting Pipes To The Outdoor Unit; Connecting The Pipes To The Outdoor Unit; Checking The Drainage - LG 18K BTU Anleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 73

4. Connecting Pipes to the Outdoor Unit

1) Connecting the pipes to the
Outdoor unit
1. Align the center of the pipings and
sufficiently tighten the flare nut with
fingers.
2. Finally, tighten the flare nut with torque
wrench until the wrench clicks.
• When tightening the flare nut with torque
wrench, ensure the direction for
tightening follows the arrow on the
wrench.
Pipe size
Liquid
Side
Gas Side

5. Checking the Drainage

1) Checking the Drainage
1. Remove the Air Filter.
2. Check the drainage.
• Spray one or two glasses of water upon
the evaporator.
• Ensure that water flows drain hose of
indoor unit without any leakage.
Torque
1/4"
1.8kg.m
3/8"
4.2kg.m
1/2"
5.5kg.m
5/8"
6.6kg.m
3/4"
6.6kg.m
Outdoor unit
14
Gas side piping
(Bigger Dia.)
Liquid side piping
(Smaller Dia.)
Torque wrench

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

24k btu36k btu60k btu

Inhaltsverzeichnis