Herunterladen Inhalt Inhalt Diese Seite drucken

Inhaltsverzeichnis - Daikin Altherma 3 H HT ECH2 O Referenzhandbuch Für Den Monteur

Wärmepumpe (innengerät) mit integriertem wärmespeicher
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 69
List of contents
List of contents
1.1
Particular safety instructions .....................................................
1.1.1
Observing the instructions ..........................................
1.1.2
Meaning of warnings and symbols..............................
1.2
1.2.1
General .......................................................................
1.2.2
Intended use ...............................................................
1.2.3
Device installation room..............................................
1.2.4
Electrical installation ...................................................
1.2.5
1.2.6
1.2.7
Operation ....................................................................
1.3
1.4
Warranty conditions...................................................................
2.1
Design and components............................................................
2.2
Function of the 3-way switch valves.......................................... 10
3.1
Dimensions and connection dimensions ................................... 11
3.2
Transport and delivery............................................................... 12
3.3
Installing the heat pump ............................................................ 12
3.3.1
Selecting the installation site....................................... 12
3.3.2
Installing the device .................................................... 13
3.4
Preparing the device for installation .......................................... 14
3.4.1
Remove the front screen............................................. 14
3.4.2
Remove the protective cover ...................................... 14
3.4.3
3.4.4
Open the controller housing........................................ 15
3.4.5
3.4.6
Opening the vent valve ............................................... 16
3.4.7
return flow ................................................................... 16
3.4.8
Making the hood opening............................................ 17
3.4.9
3.4.10
Securing the hood....................................................... 17
3.5
Installing optional accessories................................................... 18
3.5.1
3.5.2
set ............................................................................... 18
3.5.3
Installation of the DB connection kit............................ 18
3.5.4
Installation of the P connection kit .............................. 18
3.6
Water connection ...................................................................... 19
3.6.1
Connecting hydraulic lines .......................................... 19
3.7
Electrical connection ................................................................. 20
3.7.1
Overall connection diagram ........................................ 22
3.7.2
strips ........................................................................... 23
3.7.3
Mains connection ........................................................ 23
3.7.4
3.7.5
Connecting the heat pump outdoor unit...................... 23
3.7.6
(optional) ..................................................................... 24
3.7.7
External switching contact .......................................... 24
3.7.8
EBA (external requirement request) ........................... 24
3.7.9
Connecting an external heat generator....................... 25
3.7.10
Connecting the room thermostat................................. 26
3.7.11
3.7.12
Connecting the HP convector ..................................... 26
3.7.13
3.7.14
Off-peak mains connection (HT/NT) ........................... 27
3.7.15
3.8
Filling the system....................................................................... 28
3.8.1
pressure gauge ........................................................... 28
Installer reference guide
2
3.8.2
Filling hot water heat exchangers ................................ 28
3.8.3
Filling the storage tank................................................. 28
3.8.4
Filling the heating system ............................................ 29
3
3
5.1
Requirements ............................................................................. 32
3
5.2
Commissioning at low ambient temperatures ............................ 32
4
5.3
Bleeding the hydraulic system.................................................... 32
4
5.4
Checking the minimum flow ....................................................... 33
4
5.5
Start screed drying (only if required) .......................................... 33
5
5.6
Commissioning checklist ............................................................ 33
5
5.7
Hand-over to the user................................................................. 33
6
6
6
6.1
6
6.2
Maintenance work to be carried out annually............................. 34
6
6.3
Filling, topping up the storage tank ............................................ 35
7
6.4
Filling, topping up the heating system ........................................ 35
8
8
7.1
Troubleshooting.......................................................................... 36
7.2
Overview of possible malfunctions ............................................. 36
11
7.3
Fault codes................................................................................. 39
7.4
Emergency operation ................................................................. 48
8.1
Temporary shutdown.................................................................. 49
8.1.1
Draining the storage tank............................................. 49
8.1.2
8.2
Final shutdown and disposal ...................................................... 50
9.1
Information on the type plate...................................................... 52
9.2
Tightening torque ....................................................................... 52
9.3
Electrical connection diagram .................................................... 53
9.4
Piping diagram for refrigerant circuit .......................................... 55
9.5
Hydraulic connection .................................................................. 55
9.5.1
Hydraulic system connection ....................................... 55
9.6
Technical data ............................................................................ 57
9.7
Combination table ...................................................................... 59
9.8
Performance tables .................................................................... 59
9.9
Dimensions................................................................................. 60
9.9.1
Device .......................................................................... 60
9.9.2
(optional) ...................................................................... 61
9.10
Piping diagram ........................................................................... 62
9.11
External connection diagrams .................................................... 64
9.12
Installation .................................................................................. 65
9.12.1
Backup heater installation............................................ 65
9.12.2
Controller housing........................................................ 66
9.13
Hydraulic capacity ...................................................................... 66
Heat pump (indoor unit) with integrated heat accumulator
31
32
34
36
49
52
67
Daikin Altherma ETS(X/H)(B)-D
008.1447299_00 - 06/2019 - EN

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis