Herunterladen Inhalt Inhalt Diese Seite drucken

WIKA P-3x Betriebsanleitung Seite 17

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

6. Commissioning, operation
1.
Loosen the screw (1).
2.
Loosen the cable gland (2).
3.
Pull the angle housing (5), with the terminal block (6)
inside, away from the instrument.
4.
Via the mounting hole (D), lever the terminal block (6)
out of the angle housing (5). Do not try to push the
terminal block (6) out using the screw hole (1) or the
cable gland (2), otherwise the sealing of the angle
housing could be damaged.
5.
Select a conductor with an outer diameter matched
to the angle housing's cable gland. Slide the cable
through the cable gland (2), ring (3), sealing (4) and
angle housing (5).
6.
Connect the cable ends to the appropriate connection terminals on the terminal block (6) (see table
"Connection diagrams").
7.
Press the angle housing (5) onto the terminal block (6).
8.
Tighten the cable gland (2) around the cable. Make sure that the sealings are not damaged and that
the cable gland and sealings are assembled correctly in order to ensure ingress protection.
9.
Place the flat, square gasket over the pressure sensor's connection pins.
10. Slide the terminal block (6) onto the pressure sensor's connection pins.
11. Secure the angle housing (5) and terminal block (6) to the pressure sensor with the screw (1).
WIKA operating instructions pressure transmitter, model P-3x
(1)
(2)
(3)
(5)
(4)
(6)
EN
Line connector
(female)
Sealing
Instrument
connector (male),
case with process
connection
17

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis