Herunterladen Inhalt Inhalt Diese Seite drucken

Overhaul Service (After Approx. 100 Operating Hours); Repairs By Schmid & Wezel Customer Service Technicians; Transport And Storage; Disposal - EFA Z28 Betriebsanleitung

Abviertelzange
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

6.3 Overhaul service (after approx.
100 operating hours)
6.3.1 Hydraulic unit
Regularly inspect oil fluid filling level and refill fluid,
if necessary. For detailed instructions, see chapter
3.1.2 "Hydraulic unit" (page 3) and separate
operating manual of the hydraulic unit.
ATTENTION!Use only food-grade fluid that is H1
approved! Prevent contamination! Use filling funnel
with fine-mesh screen (mesh size approx. 0.4 mm).
At least once every year, drain off fluid, inspect it for
contamination and replace it, if necessary.
The hydraulic fluid is classified as a hazardous
substance and must be handled and disposed of
according to the applicable regulations. Never
dispose of hydraulic fluid through the public sewage
system.
6.3.2 Sharpening of blades
Improperly sharpened cutter blades lead to low
production rates and an increased risk of injury to
the operator.
We are therefore providing a blade
sharpening service for customers.
Contact your local authorised repair
shop or the Schmid & Wezel customer
service department.
If the cutter is used according to the instructions,
the blades must normally not be resharpened.
If sharpening is however necessary, use a
conventional grinder and ensure that only little
material is ground off.
Do not use any force when
operating or repairing the
equipment as parts could
otherwise be damaged! Use only
original EFA spare parts!
6.4 Repairs by Schmid & Wezel
customer service technicians
Before carrying out any repair
work, disconnect the cutter from
the power supply!
All repairs must be completed by specialist
technicians.
Schmid & Wezel operates an extensive after-
sales service network. Contact your local
Schmid & Wezel
D 75433 Maulbronn
authorised repair shop or the Schmid & Wezel
customer service department for more
information on our services.
On request, we provide spare parts lists for
repair shops with specialist technicians.
After completion of the repair work, the gear
system must be lubricated again for life!

7. Transport and storage

The splitting saw must be stored in a dry, well-
ventilated room.
For transport, clean the machine as described in
chapter 6.1.2 "Cleaning" (page 6), and dry it
thoroughly.
During transport, protect the splitting saw against
damage from impacts, etc.

8. Disposal

For proper disposal, return your equipment to
Schmid & Wezel.
Seite/ Page
9/ 9
Ausführung/ Version
2014

Werbung

Kapitel

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Z28s

Inhaltsverzeichnis