Herunterladen Inhalt Inhalt Diese Seite drucken

Preparation For Assembly; Mounting; Drive Rail And Drive Mounting - Alutech Levigato LG Serie Montage- Und Betriebsanleitung

Vorschau ausblenden Andere Handbücher für Levigato LG Serie:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

PREPARATION fOR ASSEMBLy

The sizes (overall, connection, mounting dimensions), which are ensured by the scope of supply,
are presented in fig. 1.
The service life of the product is 8 years with the intensity of work of 10 cycles of 'opening-closing'
of the gate per day.
3.
PREPARATION fOR ASSEMBLy
Prior to mounting:
• read the section 1. 'General warnings and safety rules' . Make sure that all rules and
requirements are met.
• determine the place, where each component of the drive system will be installed.
Fig. 2 presents a typical diagram of the garage door automation. Together with the user,
determine the places for the installation of the control devices.
• determine the scheme, according to which all the electric devices of the drive system will
be connected.
• lay the electric cables to the places, where the drive system components are to be installed,
complying with the regulations in force.
4.

MOUNTING

4.1

DRIVE RAIL AND DRIVE MOUNTING

Recommended mounting procedure:
• determine and mark the mounting line in the middle of the door (fig. 3). If mounting
cannot be performed in the middle of the door, it acceptable to mount at the distance
not exceeding 100 mm to left or to the right from the middle of the door.
• Install the door bracket using eight 6.3 × 20 screws (fig. 4). Drill Ø 5 mm holes in the door leaf
metal.
Y
ATTENTION! Limit the drilling depth during drilling.
Do not allow through drilling of the door leaf.
• Install the rail fastening bracket on the wall on the drive rail using two M8 × 16 bolts
and two M8 nuts (fig. 5A). The product construction allows turning of the bracket by
90 ° in relation to the rail during installation (fig. 5B), e.g., to mount the rail on the ceiling
without suspension strips.
• Mark the rail fastening bracket installation area on the wall (fig. 6 ). The clearance between
the rail and the maximum (top) spot of the door movement should be 20–50 mm.
• Fasten the rail fastening bracket on the wall (fig. 7).
Y
ATTENTION! Fixings (dowels, anchors), required to install the rail, should be selected to
comply with the type of construction surfaces present (material and thickness of the wall or
ceiling). They are not included in the kit. The fittings should be able to bear the weight of the
rail with the drive fitted and resist the force required to open and close the door. Beware of
wear and deformation, which will occur in time.
• Install the brackets, fastening the rail to the ceiling, on the drive rail (fig. 8).
• Install one bracket at the distance 180 ... 220 mm from the rail edge (fig. 9).
• Install the second bracket in ensuring position which ensures the best stability of the rail.
For example, at 1/3 from the door opening (fig. 10).
• Position (align) the rail in relation to the door construction (fig. 11). Adjust the position of
the brackets of the rail and determine the necessary distance L from the rail to the ceiling
(suspension distance).
LEVIGATO DRIVES (LG SERIES)
|
LEVIGATO ANTRIEBE (SERIE LG)
|
COMMANDES LEVIGATO (SERIE LG)
17

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis