Herunterladen Inhalt Inhalt Diese Seite drucken

Installation Location - McQuay C Serie Installationsanleitung

Vorschau ausblenden Andere Handbücher für C Serie:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 45
Installation work should be done by the authorized dealer or qualified contractor. Never install the unit yourself.
Make sure there is sufficient space for airflow around the unit. The discharged air should be directed outside using a duct
should the unit be installed in a plant room.
Vibration isolator should be provided to prevent vibration and noise from the unit.
When installing the unit on the ground, make sure the selected site is not subject to flooding.
There should be sufficient space allocated for ventilation, servicing and maintenance when installing the unit. Refer to the
following figures for proper location.
500
HANGER
HANGING BELT

INSTALLATION LOCATION

500
Figure 3: For single unit installation
AIR FLOW
AIR FLOW
1-2
Figure 2
500

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis