Herunterladen Inhalt Inhalt Diese Seite drucken

Thermalright Silver Arrow ITX-R Handbuch Seite 14

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Installation Instructions:
Step 1:
Step 1 : Back Plate Installation
Choose the platform (AMD) you are in use. Make four M3L10 Screws go through the Metal Back
Plate+Mylar from bottom towards top. And then place the Metal Back Plate+Mylar on the table. Put the
four Washers (for AMD) around the Screw Cylinders.
Step 2:
Step 2 : 939 Back Plate Cap
Note: When installing on a 939 platform, please
first insert the Back Plate Cap into the opening
on the Back plate. Make sure you have the Cap
facing downwards. (Only for 939).
Step 4:
Step 4 : Anchoring Mount Installation
Place the Anchoring Mount on the Screw Nuts.
Use the four M3L6 Screws to fix the Anchoring
Mount on to the Screw Nuts on a criss cross
pattern.
11
4
2
1
3
Step 3:
1
3
Step 3 : Screw Cylinder Installation
Place the motherboard on top of the Back Plate.
See the four Screw Cylinders go through the four
holes around the processor socket. Cap the four
Screw Cylinders with the four Screw Nuts on a
criss cross pattern. Make sure the side with a
washer is facing the Back Plate.
Step 5:
Step 5 : Applying Thermal Paste
Apply the Chill Factor III to the base of the
Heatsink and the surface of the CPU evenly.
AMD
4
2

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis