Herunterladen Inhalt Inhalt Diese Seite drucken

Electrical Connections - DITEC LUXO Montage- Und Wartungshandbuch

Vorschau ausblenden Andere Handbücher für LUXO:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 21
5.

ELECTRICAL CONNECTIONS

GB
The gearmotor LUXO3R can be connected to the LOGICM
control panel.
Note: if using electric locks, it is necessary to activate the electric
lock release function.
The gearmotors LUXO3B and LUXO5B can be connected to
the E2 and LOGICM control panels.
The gearmotor LUXO3BH can be connected to the D2HL and
VIVAH control panels.
The gearmotor LUXO5BH can be connected to the VIVAH
control panel.
The electrical connections and the start-up of the gearmotors
LUXO3R-3B-3BH and LUXO5B-5BH are illustrated in fig. 6
and in the installation manuals of the E2, LOGICM, D2HL and
VIVAH control panels.
Place the cover [10] back onto the gearbox connecting the earth
cable [J] to the gearbox itself.
(Fig. 6) To increase the protection of the motor cable, a flexible
Ø16 raceway [N] may be used and the associated Ø20 union
[P], not supplied by us.
Tighten the screw [F].
All right reserved
All data and specifications have been drawn up and checked with the greatest care. The manufacturer cannot however take any
responsibility for eventual errors, ommisions or incomplete data due to technical or illustrative purposes.
LUXO - IP1684
6.
MAINTENANCE PROGRAM (every 6 months)
Without 230 V~ power supply and batteries if present:
-
Clean and lubricate, using neutral grease, the turning pins,
the hinges of the gate and the drive screw
-
Check that fastening points are properly tightened.
Reconnect the 230 V~ power supply and batteries if present:
-
Check the power adjustments.
-
Check the good operation of all command and safety functions
(photocells).
-
Check the good operation of the release (only for irreversible
piston).
-
If the D2HL or VIVAH control panel is mounted, check for
battery continuity by powering off and performing several
manoeuvres in sequence. Upon test completion, power
back on (230 V~).
ATTENTION: For spare parts, see the spares price list.
14

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis