Herunterladen Inhalt Inhalt Diese Seite drucken

Initial Operation - Bosch SCT 815 Originalbetriebsanleitung

Kalibriervorrichtung
Vorschau ausblenden Andere Handbücher für SCT 815:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1
precisely aligned or the measurement bay
requirements are not met
( 14
---Separator---

3. Initial Operation

3.1 Installing the SCT 815
1. Make sure all components specified in the scope of
delivery are present.
2. Position the guide tube with the tube connectors
over the holes in the base plate
6 Nm
1 1
3
4
2
 4:
Securing the guide tubes
(1) Guide tube with tube connectors
(2) Base plate
(3) Hex socket head cap screw
(4) Washer
3. Using hex socket head cap screw
fasten the tube connector to the base plate as
shown in
 4
.
4. Slide the preassembled tool holder
guide tubes, and use the knurled screw
secure it.
2
1
 5:
Attaching the tool holder
(1) Preassembled tool holder
(2) Knurled screw
Robert Bosch GmbH
"Prerequisites").
 4(1)
.
and washer
(3)
(4)
onto the
 5(1)
to
 5(2)
2
1
Initial Operation | SCT 815 | 15 | en
5. Using the holes, position the line laser mount over
the tube connectors on the guide tubes
6 Nm
1
3
4
2 2
5
 6:
Attaching the line laser mount
(1) Line laser mount
(2) Tube connector on guide tubes
(3) Countersunk bolt
(4) Washer
(5) Hex nut
6. Using countersunk bolt
(3),
, fasten the mount for the line laser to the tube
(5)
connectors as shown in
7. Slide the prismatic reflector
holder.
 7:
Sliding the prismatic reflector onto the tool holder
(1) Prismatic reflector
8. Secure the plastic screws
.
 6(1)
washer
and hex nut
(4)
 6
.
 7(1)
onto the tool
1
 8(1)
on the tool holder.
1 689 989 362 | 2018-08-01

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis