Herunterladen Inhalt Inhalt Diese Seite drucken

CombiSteel 7469 series Gebrauchsanweisung Seite 10

Kühlkammer
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Fig.4 Door WEH Installation
1- Profile N15
2- WEH
3- Soft insert (door sealing)
The door WEH is installed as follows:
remove the profile, item.1 (Fig. 4), insert the WEH in the door profile slot (Item 4), lead the wires
through the holes made in the profile, Item 1, and in the soft insert, Item 3, and connect these to the
terminals of the junction box, Item 5 (Fig. 5).
mount the profile, Item 1.
The holes to lead out the door WEH should be drilled to suit the job.
When the compensation valve is installed, hole Ǿ 65 mm should be drilled in the side panel. Perform the
installation in compliance with Fig. 6. Never place the valve in the upper part of the panel opposite the
monoblock unit.
Fig.6 Compensation valve installation
1- Compensation valve
2- Side panel
3- Valve barrel
4- Valve cover
The room should be illuminated by a source of light, and that is to be done by the customer.
The electrical equipment (Fig.7, Fig.8) is recommended to be connected after the refrigeration unit is completely
installed (in compliance with the Refrigeration Unit Operations Manual).
Fig.5 Door WEH connection
1- Terminal box
2- WEH
3- Door
4- Cable (wire) coupling
5- Junction box
www.combisteel.com
10

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis