Herunterladen Inhalt Inhalt Diese Seite drucken

Waeco AirCon Service Center ASC2500 Bedienungsanleitung Seite 88

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1
Operation
8.6.3
Filling process
1. Enter the preferred settings and press ENTER to confirm.
2. If "Filling phase" has been selected, enter the required value, oth-
erwise continue with chapter "Selecting connections" on page 89.
3. Enter the refrigerant oil quantity.
4. Press the cursor key .
5. Enter the additive quantity.
6. Press the cursor key .
7. Enter the refrigerant quantity.
8. Press ENTER to confirm all settings.
I
NOTE
 If extraction is taking place in the same process sequence, the
quantity of fresh oil is counted as an additional filling quantity, and is
added to the drained oil quantity extracted beforehand. If this value
is set to 0, exactly the quantity of oil which was extracted will be filled
again.
 To add fresh oil or UV additive, a vacuum process must be per-
formed in the same process sequence. If no vacuum process has
been selected, only refrigerant can be selected in the filling menu.
88
Filling phase?
ENTER-OK STOP-EXIT
PAG oil
UV tracer
Refrigerant
ENTER-OK STOP-EXIT
Yes
No
ml.
1
ml.
7
g.
500
ASC2500
EN

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis