4.3 Installation of the Supply control unit
DIN rail mounting
1
2
DIN rail
The accumulator will be connected to the terminals of the Supply control unit, after the
commissioning of the system.
4.4 Installation of the Video connection box
DIN rail mounting
1
2
DIN Rail
3
Retainer
Frontal view
Lateral view
3
Retainer
Frontal view
Wall mounting
A3,5 x 32 screw (2 pcs.)
Back view
Wall mounting
A3,5 × 32 Screw (2 Pcs.)
Back view
Lateral view
Protection lid (2 pcs.)
B2,9 x 9,5 screw (4 pcs.)
Protection lid (2 St.)
B2,9 × 13 Screw (4 Pcs.)
7/17