Herunterladen Inhalt Inhalt Diese Seite drucken

Mounting Preparation - GUTMANN CARTA 7500 Montageanleitung

Vorschau ausblenden Andere Handbücher für CARTA 7500:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1
EN

5. MOUNTING PREPARATION

Transport, unpacking, installation
Condensation may occur if the appliance is brought into the installation site from a
cold environment. Please wait until the appliance has adjusted to the temperature and
is completely dry before operating it. The acclimatization period depends on the tempe-
rature difference and the type and design of the appliance. However, it should be at
least 12 hours.
Please wear protective gloves during installation to avoid the risk of injury. Prepare the
necessary tools before mounting the hood.
For the installation of the hood, on-site requirements must be met to ensure smooth
installation
of
Prepare a suitable exhaust air duct in the ceiling, open the false ceiling, create ope-
nings, etc...
Before drilling in the wall, make sure that no pipes behind it are damaged.
34
the
hood
and
kitchen
appliances
must
be
covered.

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Carta 7510

Inhaltsverzeichnis