Herunterladen Inhalt Inhalt Diese Seite drucken

DeLonghi Kyoto PLK130 Bedienungsanleitung Seite 36

Und wärmepumpen single split on-off und dc inverter
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 63
After having connected the pipe according to the instruc-
tions, install the drain hose. Now install the power cables.
After connection, lag the pipe, cables and drain hose with
the insulating material.
Lag the pipe joints with insulating material, securing it
with vinyl tape.
Cover the through holes in the wall with elastic mate-
rial that is also noise absorbing if possible.
Upon completion of installation, check that the con-
densate flows out regularly.
Lagging the pipes
Place the drain hose (not provided in the kit) below the
piping, taking care not to create siphons.
Use polythene foam with thickness exceeding 6 mm
to insulate the connections.
The drain hose must slant downwards to aid drainage.
Do not bend the drain hose or leave it protruding
or twisted and do not put the end of it in water. If an
extension is connected to the drain hose, ensure that
it is lagged when it passes into the indoor unit.
If the piping is installed to the right, the pipes, power
cable and drain hose must be lagged and secured
onto the rear of the unit with a pipe connection.
1. Insert the pipe connection into the relative slot.
2. Press to join the pipe connection to the base.
Connecting the pipes
Use two wrenches to tighten the indoor unit pipe joints.
Pay particular attention to the torque recommended
below in order not to risk deforming and damaging
flared pipes, connectors and nuts.
Tighten the connections using two wrenches working
in opposite directions (see technical data table).
14
Lagging
Covered by
vinyl tape
Attach at
this point

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis