Herunterladen Inhalt Inhalt Diese Seite drucken

Installation Instructions; Flow Diagram; En Instructions For Use / Assembly Instructions - HANSGROHE AXOR Starck 10466000 Gebrauchsanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1
Safety Notes
Gloves should be worn during installation to prevent
crushing and cutting injuries.
The product may only be used for bathing, hygienic
and body cleaning purposes.
Do not allow the streams of the shower touch sensi-
tive body parts (such as your eyes). An adequate
distance must be kept between the shower and you.
The product may not be used as a holding handle. A
separate handle must be installed.
The hot and cold supplies must be of equal pres-
sures.

Installation Instructions

• Prior to installation, inspect the product for transport
damages. After it has been installed, no transport or
surface damage will be honoured.
• The pipes and the fixture must be installed, flushed
and tested as per the applicable standards.
• The plumbing codes applicable in the respective
countries must be observed.
Technical Data
Operating pressure:
Recommended operating pressure:
Test pressure:
(1 MPa = 10 bar = 147 PSI)
Hot water temperature:
Recommended hot water temp.:
Thermal disinfection:
Safety against backflow
The product is exclusively designed for drinking water!
Symbol description
Do not use silicone containing acetic acid!
Safety Function (see enclosed
brochure)
The desired maximum temperature for exam-
ple max. 42º C can be pre-set thanks to the
safety function.
4
English
max. 1 MPa
0,1 - 0,5 MPa
1,6 MPa
max. 70°C
65°C
max. 70°C / 4 min
Assembly see page 32
Adjustment (see page 35)
After the installation, the output tempera-
ture of the thermostat must be checked. A
correction is necessary if the temperature
measured at the output differs from the
temperature set on the thermostat.
Dimensions (see page 31)

Flow diagram

(see page 31)
Hand shower
Bath Spout
Operation (see page 38)
Maintenance
To guarantee the smooth running of the
thermostat, it is necessary from time to time
to turn the thermostat from total hot to total
cold.
Maintenance check valve (see
page 36)
The check valves must be checked regularly
according to DIN EN 1717 in accordance
with national or regional regulations (at least
once a year).
Maintenance Secuflex hose (see
page 36)
Repeat cleaning when pull out becomes
difficult.
Spare parts (see page 40)
Cleaning
see enclosed brochure
Test certificate (see page 31)

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis